Description
WNS SERIES HORIZONTAL THREE-PASS CONDENSING OIL/GAS FIRED STEAM BOILER
1. This boiler use there pass structure,designed big furance to make completely combustion.
2.This boiler is Corrugated structure,increased heating area of transferring, and meet the boiler expansion after heating.
3.Threaded smoke tube structure, enhanced the heating transferring.
4. Wet back type design,Full die butt welding,high reliability and low maintenance cost.
Boiler Model | WNS0.5 | WNS1 | WNS2 | WNS3 | WNS4 | WNS6 | WNS8 | WNS10 | WNS15 | WNS20 | |
Rated steam capacity(T/H) | 0.5 | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 15 | 20 | |
Rated steam pressure(Mpa) | 1.0/1.25/1.6/2.5 | ||||||||||
Rated steam temperature(ºC) | 184/194/204/226 | ||||||||||
Feed water temperature(ºC) | 20/104 | ||||||||||
Thermal efficiency(%) | >98 | ||||||||||
Nox emission(mg/m3) | 120/80/30 | ||||||||||
Exhaust gas temperature(ºC) | <60 | ||||||||||
Fuel type | Light diesel oil/Heavy oil/Natural gas/Liquefied gas/City gas | ||||||||||
Fuel consumption | Light diesel oil(kg/h) | 32.5 | 64.6 | 129.3 | 192.9 | 258.2 | 388.6 | 514.6 | 641.7 | 960.1 | 1276.2 |
Natural gas(Nm3/h) | 35.7 | 70.1 | 140.3 | 212.1 | 283.4 | 424.2 | 566.3 | 707.8 | 1061.7 | 1415.8 | |
Max transportation weight(t) | 3.5 | 5.5 | 8.0 | 10.7 | 11.6 | 17.5 | 22.5 | 26.8 | 35.2 | 45.5 |
OUR BOILER WORKSHOP WELDING JOB
FAQ
Q1: Where is your company?
A1: We are located in qingdao which is famous for international business and international sea port, it’s east to delivery boiler to Southeast Asia, Africa, Middle East, South America, Oceania and Europe.
Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.
Q3: How about the installation and commissioning?
A3: We’ll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.
Q4: What’s the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.
Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.
Q7: What’s your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.
Q8: How’s the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For solid fuel boilers, bigger than 2 ton/hr or 1.4 MW shall be shipped by frame rack (flat) container or bulk carrier.
Reviews
There are no reviews yet.