Description
YLL Series Vertical Organic Heat Transfer Heater YLL series Vertical organic heat transfer heater have pipe rack structure, assembled with mechanical chain grate; main body have convection and radiation heating surface; radiation heating surface is assembled by two radiation pipe square coil; convection heating surface is assembled by serpentine radiation pipes. It is increasing heating surface and low down the height of main body, enhancing boiler overload ability. This model can get less than 320C at under 0.7MPA.it can be used in chemicals, light industries, construction materials, food processing, packing equipment ,plastic goods, rubber industries and so on.
Boiler Model | YLL-1000MA | YLL-1200MA | YLL-1400MA | YLL-1800MA | YLL-2400MA | |
Thermal Power | KW | 1000 | 1200 | 1400 | 1800 | 2400 |
Mkcal/h | 0.8 | 1 | 1.2 | 1.5 | 2 | |
Working Pressure | Mpa | 0.7 | 0.7 | 0,7 | 0.7 | 0.7 |
Max Outlet Temperature | ºC | 320 | 320 | 320 | 320 | 320 |
Inlet Temperature | ºC | 290 | 290 | 290 | 290 | 290 |
Heat Transfer Medium | Heat Conduction Oil | |||||
Fuel Application | II,III type bitumite | |||||
Circulating Oil | m3/h | 100 | 100 | 100 | 160 | 200 |
Efficiency | % | ≥73 |
Remark: This parameter is just for reference, for exact parameter, subject to our drawings
Our Services as below:
Pre-sale Service
- Provide free boiler selection service to provide you with a more suitable boiler and improve your production.
- Free boiler operation cost calculation helps you calculate the boiler production and operation cost and save fuel cost.
- Design environmental protection scheme free of charge to ensure that the local environmental protection policy is met.
On-Sale Service
- Provide you with comprehensive and professional technical support, help you solve all boiler problems, and repair the boiler system for you.
- Provide you with an online delivery service, and you can see your delivery in real-time.
- Provide you with a production tracking service, and you can regularly understand your boiler production process.
- Provide you with installation and commissioning services, and you can quickly arrange for the factory to be put into operation.
After-sale Service
- 12 months from the date of bill of lading: if the equipment fails within the warranty period, we will provide warranty services for the products sold.
- During the warranty period, free warranty service (including some accessories) can be obtained for faults due to equipment quality or non-Party A’s reasons
- Remote support: if the boiler has problems during use, remote technical support can be provided.
Reviews
There are no reviews yet.