Description
Heat Pipe is both side sealed pipe ,which have easy evaporation medium inside ,and vacuum condition. pipe inside was treated to avoid any reaction with pipe. when heat the pipe evaporation section ,inside medium will collect the heat energy and become gaseous to go upto condensing section ,then release the heat energy and become soild medium again and fall down to pipe bottom again.
Heat Pipe have different fins based on the hot smoke element.and these fins can enhance the heat transferring efficiency more than 30%-80%.
Jet-flow pipe heat transferring efficiency is very high, normal heat pipe heat transferring rate :22W(M2.C),but Jet-flow pipe can increase to 52W(M2.C).
Jet-flow pipe through air spray to low down the pipe temperature , increase the pipe working life.and easy to clean dust,and hardly to block dust on it. and spray air can be heated to more than 600C, so it can sue for high smoke heat energy saving stage.
Heat Pipe steam generator widely use all kinds of Klin ,gas/oil engine,other waste hot smoke industries,We can design Heat Pipe steam generator based on the smoke element to saving energy and get more steam or hot water for clients.
Heat Pipe steam generator data(steam pressure 0.6mpa)
Exhuast smoke temperature ºC |
16000-24000NM3/H | 8000-12000NM3/H | 4000-6000NM3/H |
300ºC | 1.1-1.4T/h steam | 0.5-0.6T/h steam | 0.4T/h steam |
350ºC | 1.35-1.8T/h steam | 0.6-0.75T/h steam | 0.5T/h steam |
400ºC | 1.6-2.16T/h steam | 0.7-0.9T/h steam | 0.6T/h steam |
When Exhuast smoke 4000-6000NM3/H,temperature:300C, Profit: 0.55T/hX24T/HXUSD20X30DX12M=USD95040/Year.
When Exhuast smoke 8000-12000NM3/H,temperature:300C, Profit: 1.2T/hX24T/HXUSD20X30DX12M=USD207360/Year.
FAQ:
Q: Are you manufacturer?
A: Yes, we are a manufacturer. Our factory established in 1983 in Qingdao.
Q:How to choose a boiler type ?
A: Generally we should confirm the boiler type (steam or hot water), capacity,
pressure(or output,temperature) and fuel(coal, biomass, gas or oil) of the boiler.
Q: How long is the warranty time for the boilers?
A: Based on highly responsible for your esteemed company, our company provides one year free maintenance due to equipment itself failure.
Q: How about the installation ?
A:We could offer you 2 proposals.
i)Guide installation
Our company arranges 1-2 staffs to guide the installation of boiler on site , fully guarantee the installation quality.
ii)Staff installation
Our company is in charge of installation process, only your company to provide accommodation, round-trip cost and the wages of workers.
Q: Could you offer some wear parts?
A: Our company provides one set of tools for free, such as wrenches, gaskets used for convenient maintenance.
Q: What’s your MOQ?
A: 1 set, if purchase more, you will get a more favorable price.
Q: Do you have any Certificate?
A: Yes. We have got ISO9001 & ISO14001 DOSH certificate. If necessary, we could help you to get CE ASME certificate.
Q: What is your payment term ?
A: T/T, L/C is well accepted.
Reviews
There are no reviews yet.