Inquiry

Contact Form

Smoke Clearance Device of Wet Scrubber

Smoke Clearance Device of Wet Scrubber, Find Details and Price about Boiler Parts Boiler Accessories from Smoke Clearance Device of Wet Scrubber – QINGDAO HAMMER INDUSTRIES CO., LTD.

Certification: ISO
Installation Method: Vertical
Operation Type: Automatic
Medium Material: Metal Fiber
Dust Collecting Method: Dry
Type: Cyclone Dust Collector
Transport Package: Naked
Origin: China
HS Code: 84029000

Basic Info:

US$6,000.00-100,000.00 / Piece FOB Price:
1 Piece Min. Order:
Qingdao, China Port:
10sets/Month Production Capacity:
L/C, T/T, D/P, Western Union, Paypal, Money Gram Payment Terms:
84029000 HS Code:

Category & Tag:

Smoke Clearance Device of Wet Scrubber

DMC PULSE BAG DUST COLLECTOR  WORKING PRINCIPLE
Dust smoke go into this collector from its middle part,some heavy dust due to its weight will fall down to bottom  dust hopper, other light dust will go into filter of bag and stick at outside of bags, clean smoke will go through the bags and come out from top of this collector.Due to dust sticked on bags continously adding, the resistance will geting higher,when it reaches1.0-1.2kpa.pulase controller will automatically start ,pulase valve will open, and spray to all bags ,and make bags coming big suddenly,removing the dust sticked on bags, and these dust will fall down to bottom dust hopper and then drain out of the collector through discharge valve.

NameDMC32DMC48DMC64DMC80DMC96DMC112DMC128
Filting area(m2)24364860728496
Q of bags3248648096112128
Bag size(mm)ø120X2000
Pressure lose Pa1200
Dust remve efficiency ‰990-999
Inlet smoke  dust content  g/m3≤200
Filting smoke speed  m/min1-2
Capacity  m3/h1500-24002500-35003500-45004500-55005000-65006500-85008500-9200
Pulase valve size1″1″1″1″1″1″1″
Pulase valve  quantity46810121416
Over size(mm)1440X760X40001440X1100X40001440X1440X40001440X1780X42001440X2120X42001440X2460X42001440X2800X4500
Weight(kg)1350162018502360280032003600
Supply air pressure Mpa0.4-0.6
Fan power kw1.52.235.57.57.57.5
Compressed air consumption m3/min0.130.170.210.250.30.340.42
Suitale for Boiler1T1T1T1T2T2T3T

 

NameMC100MC120MC150MC180MC200MC240MC300MC360MC420MC490MC560
Filting area(m2)100120150180200240300360420490560
Q of bags100120150180200240300360420490560
Bag size(mm)ø130X2450
Pressure lose Pa1200
Dust remve efficiency ‰990-999
Inlet smoke  dust content  g/m3≤100
Filting smoke speed  m/min1-2
Capacity  m3/h7800-1020010200-1200011700-1530015000-1830017000-2050019000-2450025000-2880029000-3500035200-4050041000-4750047800-54000
Pulase valve size1.5″1.5″1.5″1.5″1.5″1.5″1.5″1.5″1.5″1.5″1.5″
Pulase valve  quantity1010101520202530303540
Over size(mm)2150X2150X55002150X2270X55003170X2150X55003170X2270X58004190X2150X58004190X2870X58005210X2870X60006230X2870X60006230X3372X60007250X3372X60008270X3372X6000
Weight(kg)3600432054006480720084501060012400145001680019500
Supply air pressure Mpa0.4-0.6
Insulation area(m2)353842485565778898110122
Compressed air consumption m3/min0.550.650.851.011.21.371.591.732.082.12.3
Suitale for Boiler2T4T5T6T7T8T9T10T12T15T20T

 

Boiler FAQs

Q: What different types of boilers are available?

DZL type steam/hot water boiler
SZL type steam /hot water boiler
SHL type steam /hot water boiler
WNS type steam /hot water boiler
SZS type steam /hot water boiler
SZW type steam /hot water boiler
CFB type steam boiler
YLW type thermal oil boiler/heater
YYL(W) type thermal oil boiler/heater
WNS type thermal oil boiler/heater
SZS type thermal oil boiler/heater
SZW type thermal oil boiler/heater
Waste heat recovery boiler
Steam generator

Q: What is a fire tube steam boiler?

A fire tube steam boiler is a boiler where the combustion gases from the burner are channeled through tubes that are surrounded by the fluid to be heated. The boiler body is the pressure vessel and contains the fluid. In most cases, this fluid is water that will circulate for heating purposes or become steam for use in processing.
Each set of tubes through which the combustion gas passes, before making a turn, is considered a “step”. Consequently, a three-step boiler will have three sets of pipes with the outlet located at the rear of the boiler.

Q: What’s advantages of our boiler?

Wide Range of Fuel Type
Applicable for a various of light oil, furnace oil, natural gas, LNG, biogas, coke gas, methanol, biodiesel, etc.

High Thermal Efficiency
New and unique design with high thermal efficiency, which save running cost of buyer

Unique Control System
Unique three-elements control system with PID unit covered PLC, inverters, and HMI to reach high level automatic running of boiler

Q: What is the turndown ratio of our boilers?

our boilers feature turndown ratios of 5:1, means the boiler’s minimum operating load is 20% of the boiler’s full capacity (100% capacity)

Q: How do I choose the right boiler?

Firstly, check the actual steam pressure and consumption required at present, and discuss with management there are extra steam required or not in next five years.
Secondly, confirm the boiler fuel type, then we will provide you an optimal boiler that take all factors in consideration.

Q: How long does an industrial steam boiler last?

The normal service life of a steam boiler is 10 to 20 years, provided that proper care and maintenance routines are applied to the feedwater and interior of the boiler.
When considering steam boiler replacement, the three most important aspects to consider are safety, economy and changing requirements to perform the function for which it is operating.

Q: What services for industrial boilers does our offer?

we offers its customers the following services for industrial steam boiler, thermal oil boiler and waste heat recovery boilers and steam generators:

Customized boiler designs.
Super quality boiler product
Installation and commissioning service
Operators training service
Lifetime maintenance service.

Q: What safety features do steam boiler have?

Boiler shutdown protection due to water level low
Boiler shutdown protection due to continuous water level low
Boiler shutdown protection due to steam pressure high
Safety valve over pressure protection.
Automatic FWP on / off

Q: What is the lead time of our boiler

The subject boiler will be delivered within 60 -90 days based on boiler capacity

Q: What primary components for boilers are there?

The most common accessories are:
Burner
Economizer and condenser
Feed water pump
Thermal deaerator (if necessary)
Chimney
Control panel
Instrument gauges and valves
we supplies all types of complementary equipment for industrial steam boilers, and designs new equipment and tools if they are necessary for the final installation to meet its clients’ expectations.

Q: What are the optional items of boiler for buyer choose from

Steam and feed water flow meter
Periodic blowdown expander (if necessary)
Continuous blowdown expander (if necessary)
Thermal deaerator (if necessary)

Q: What is the supply scope of boiler arranged by buyer

Whole civil works engineering by our design drawing
All connecting piping (steam, feed water piping)
All connecting cables (motor cables, single cables, main power supply cable)
Some connecting valves from feed water pump point
Chimney manufacture on site by our design drawing
Balance flue gas ducting manufacture on site by our design drawing
Thermal deaerator

Q: How does boiler warranty work?

The subject boiler is covered by a twelve months warranty against mechanical and/ or factory defects from date of test-run or 18 months from the date of shipment whichever comes earlier.
we shall repair or replace the components, parts or accessories covered by warranty that had become inoperative within the warranty period but not covered caused by faulty operation from the buyer.
we will provide lifetime service for boiler with cost when its warranty expired.

Q: Who will be fitting my new boiler?

Simply, a local professional boiler installing company will install the subject boiler under our engineer’s instruction and supervision

Q: How long will my installation & commissioning take?

Typically, the whole installation & commissioning work may take 1-4 months based on the subject boiler capacity.

Q: How often should I maintain my boiler?

Overhaul inspection and maintenance: 1-3 month
we will provide detail brochure regarding how and when to do maintenance work during boiler running.

Company Info

Related Products