Description
Cast Iron Economizer is used at back side of Boiler, especially for Coal/Wood/Biomass/Bagass/Rice Husk and others soild fuel boiler.
Cast Iron Economizer can absorb the heat energy from the high temperature smoke which is out of boiler back, and heat passed water in economizer ,then shift this hot water to boiler inceasing boiler efficiency and save lot of fuel cost.
Cast Iron Economizer Data:
Suitaable for boiler (TPH) | Data | Working pressure(Mpa) | Test pressure(Mpa) | Heating Area(M2) | Flue gas circulation area(m2) |
0.5TPH | 1X10 | 0.7 | 2.05 | 8.8 | 0.42 |
1TPH | 1X12 | 0.7 | 2.05 | 10.56 | 0.504 |
2TPH | 1X20 | 1.0 | 2.05 | 17.6 | 0.84 |
2TPH | 1X24 | 1.0 | 2.05 | 21.12 | 1.008 |
2TPH | 1X30 | 1.0 | 2.05 | 26.4 | 1.26 |
4TPH | 1X32 | 1.0 | 2.05 | 28.16 | 1.344 |
4TPH | 1X40 | 1.25 | 2.05 | 35.2 | 1.68 |
4TPH | 1X50 | 1.25 | 2.05 | 44.00 | 2.1 |
6TPH | 1X60 | 1.25 | 2.05 | 52.8 | 2.52 |
6TPH | 1X8 | 1.25 | 2.05 | 70.4 | 3.36 |
4TPH | 1.2X32 | 1.25 | 2.05 | 34.56 | 1.632 |
6TPH | 1.2X50 | 1.25 | 2.05 | 54 | 2.55 |
2TPH | 1.5X8 | 1.0 | 2.05 | 17.44 | 0.704 |
4TPH | 1.5X15 | 1.25 | 2.05 | 32.7 | 1.32 |
6TPH | 1.5X24 | 1.25 | 2.05 | 52.32 | 2.112 |
6TPH | 1.5X28 | 1.25 | 2.05 | 61.04 | 2.464 |
6TPH | 1.5X35 | 1.25 | 2.05 | 76.3 | 3.08 |
6TPH | 1.5X40 | 1.25 | 2.05 | 87.2 | 3.52 |
8TPH | 1.5X48 | 1.25 | 2.05 | 104.64 | 4.224 |
8TPH | 1.5X60 | 1.25 | 2.05 | 130.8 | 5.28 |
10TPH | 1.5X80 | 1.25 | 2.05 | 174.4 | 7.04 |
12TPH | 1.5X90 | 1.25 | 2.05 | 196.2 | 7.92 |
15TPH | 1.5X96 | 1.25 | 2.05 | 209.28 | 8.448 |
8TPH | 2X48 | 1.25 | 2.05 | 141.6 | 5.76 |
15TPH | 2X72 | 1.25 | 2.05 | 212.4 | 8.64 |
20TPH | 2X84 | 1.25 | 2.05 | 247.8 | 10.08 |
25TPH | 2X130 | 1.25 | 2.05 | 383.5 | 15.6 |
FAQ:
Q: Are you manufacturer?
A: Yes, we are manufacturer. Our factory established in 1983 in Qingdao.
Q:How to choose a boiler type ?
A: Generally we should confirm the boiler type (steam or hot water),capacity,pressure(or output,temperature)and fuel(coal, biomass, gas or oil) of the boiler.
Q: How long is the warranty time for the boilers?
A: Based on highly responsible for your esteemed company, due to equipment itself failure, our company provides one year free maintenance.
Q: How about the installation ?
A:We could offer you 2 proposals.
i)Guide installation
Our company arranges 1-2 staffs to guide the installation of boiler on site , fully guarantee the installation quality.
ii)Staff installation
Our company is in charge of installation process, only your company to provide accommodation, round-trip cost and pay the wages of workers.
Q: Could you offer some wear parts?
A: Our company provides a set of tools for free, such as wrench ,gasket used for Convenient maintenance.
Q: What’s your MOQ?
A: 1 set, if you purchase more, you will get a fairly favorable price.
Q: Do you have any Certificate?
A: Yes. We have ISO9001 & ISO14001 certificate. If must,we could help you get CE ASME or AS certificate.
Q: What is your payment term?
A: T/T, L/C is very well used.
Reviews
There are no reviews yet.